A Raise Boring Machine creates vertical or inclined openings between underground mine levels through a two-stage drilling process. First, a pilot hole is drilled downward from the upper level until it reaches the lower working level. A reaming head is then connected to the drill string underground. The machine rotates the drill string and pulls the reamer upward, cutting the surrounding rock to the required raise diameter. Broken rock falls to the lower level for removal.
The drilling system combines a rotary drive, hydraulic thrust and pullback mechanism, drill rods and specialized cutting tools. During pilot drilling, thrust force advances the drill string while rotary torque drives the pilot bit. During reaming, pullback force lifts the reaming head through the rock. The required thrust, torque and pullback capacity depend on the raise diameter, drilling depth and geological conditions.
OctaMach offers a range of Raise Boring Machines for underground mining, with rail-mounted, tire-mounted and foundation-free configurations. These machines cover different drilling requirements, including nominal raise diameters from 1,500 mm to 3,000 mm and drilling depths of up to 400 m. The range also includes foundation-free designs featuring hydraulic support-column systems, eliminating the need for conventional concrete foundations and supporting inclined raise construction.
Raise Boring Machine Technical Specifications
The available equipment configurations differ in drilling capacity, transportation arrangement, installation method and hydraulic performance. The following specifications present the representative technical configurations by equipment type.
Rail-Mounted Raise Boring Machine
Rail-mounted Raise Boring Machines are designed for underground mines equipped with rail transportation systems. Their modular structure allows the main drilling unit and hydraulic power station to be transported separately through underground roadways and assembled at the designated drilling location.
The rail-mounted range covers three nominal raise diameter classes, from 1,500 mm to 3,000 mm. Differences in thrust, pullback force and rotary torque allow the equipment to address different drilling requirements.
Technical Specifications
| Parameter | 1,500 mm Class | 2,000 mm Class | 3,000 mm Class |
|---|---|---|---|
| Nominal Raise Diameter (mm) | 1,500 | 2,000 | 3,000 |
| Maximum Drilling Depth (m) | 200 | 400 | 400 |
| Drill Rod / Pilot Hole Diameter (mm) | 190/216 | 214/241 | 254/280 |
| Drilling Angle (°) | 45–90 | 45–90 | 45–90 |
| Thrust Force (kN) | 620 | 800 | 2,400 |
| Pullback Force (kN) | 1,320 | 2,200 | 4,100 |
| Thrust Stroke (mm) | 1,415 | 1,450 | 1,440 |
| Rated Torque (kN·m) | 50 | 82 | 168 |
| Peak Torque (kN·m) | 60 | 94 | 197 |
| Rotation Speed (r/min) | 0–20 | 0–30 | 0–24 |
| Main Motor Power (kW) | 90 | 90 | 160 |
| Main Unit Weight (t) | 5.7 | 6.6 | 14 |
| Hydraulic Power Station Weight (t) | 3.0 | 3.0 | 3.5 |
Additional Configuration Information
- Standard voltage: 380 V
- Optional voltage: 660 V, 1,000 V and 1,140 V
- Rated hydraulic system pressure: 35 MPa
- Hydraulic oil tank capacity: 500–560 L
- Hydraulic filtration accuracy: 10 μm
- Drilling angles from 45° to 60° require an optional inclined-shaft component.
The 3,000 mm configuration delivers up to 2,400 kN of thrust force, 4,100 kN of pullback force and 168 kN·m of rated torque, making it the highest-capacity option in the rail-mounted range for large-diameter raise construction.

Tire-Mounted Raise Boring Machine
Tire-mounted Raise Boring Machines are intended for underground mines where trackless transportation and restricted roadway dimensions influence equipment installation.
The compact machine arrangement and bundled thrust-cylinder design reduce the space required for installation. This can avoid the need to excavate an oversized working chamber solely to accommodate the drilling unit.
The tire-mounted chassis allows the machine to travel on suitable underground road surfaces. Optional rail-wheel components provide another transportation method, allowing the equipment to be towed along underground tracks when necessary. This arrangement is useful in mines where rail and trackless transportation systems coexist.
Technical Specifications
| Parameter | Specification |
|---|---|
| Maximum Raise Diameter (mm) | 1,500 |
| Maximum Drilling Depth (m) | 200 |
| Pilot Hole Diameter (mm) | 216 |
| Drilling Angle (°) | 60–90 |
| Thrust Force (kN) | 620 |
| Pullback Force (kN) | 1,320 |
| Thrust Stroke (mm) | 1,415 |
| Rated Torque (kN·m) | 50 |
| Peak Torque (kN·m) | 60 |
| Rotation Speed (r/min) | 0–20 |
| Travel Speed (km/h) | 0–4 |
| Gradeability (°) | 14 |
| Ground Clearance (mm) | 160 |
| Main Motor Power (kW) | 90 |
| Diesel Engine Power (kW) | 36 |
| Main Unit Weight (t) | 6.7 |
| Hydraulic Power Station Weight (t) | 3.2 |
Electrical Configuration:
- Standard voltage: 380 V
- Optional voltage: 660 V, 1,000 V and 1,140 V
The tire-mounted design allows the machine to move along suitable underground roadways without relying on a rail system. Its compact structure makes it easier to transport and position in mines with limited underground access. The roadway must provide sufficient width and turning space, with floor conditions and gradients suitable for the machine.

Foundation-Free Raise Boring Machine
Foundation-Free Raise Boring Machines use a hydraulic support-column stabilization system to position and secure the drilling unit without constructing a conventional cast-in-place concrete foundation.
The support columns provide the positioning and stabilization needed before drilling begins. This simplifies site preparation and reduces the additional construction work associated with conventional concrete foundations.
Another important feature is the ability to perform inclined raise construction. With a specified drilling-angle range of 15°–90°, this configuration supports a wider range of inclined underground openings than the other standard configurations described above.
A dedicated drilling-tool system is used for low-inclination raise construction. The supporting floor must still have adequate bearing capacity and stability to withstand the machine’s operating loads.
Technical Specifications
| Parameter | Specification |
|---|---|
| Nominal Raise Diameter (mm) | 2,000 |
| Maximum Drilling Depth (m) | 400 |
| Pilot Hole Diameter (mm) | 241 |
| Drilling Angle (°) | 15–90 |
| Thrust Force (kN) | 1,000 |
| Pullback Force (kN) | 2,400 |
| Thrust Stroke (mm) | 1,450 |
| Rated Torque (kN·m) | 70 |
| Peak Torque (kN·m) | 94 |
| Rotation Speed (r/min) | 0–30 |
| Travel Speed (km/h) | 0–2 |
| Gradeability (°) | 14 |
| Ground Clearance (mm) | 225 |
| Diesel Engine Power (kW) | 54 |
| Diesel Tank Capacity (L) | 90 |
| Main Motor Power (kW) | 90 |
| Rated Hydraulic System Pressure (MPa) | 35 |
| Hydraulic Oil Tank Capacity (L) | 480 |
| Hydraulic Filtration Accuracy (μm) | 10 |
| Main Unit Weight (t) | 10.5 |
| Hydraulic Power Station Weight (t) | 2.3 |
Electrical Configuration
- Standard voltage: 380 V
- Optional voltage: 660 V, 1,000 V and 1,140 V
The hydraulic support-column system secures the machine without the need for a conventional concrete foundation. By avoiding concrete foundation construction, site preparation can be shortened by approximately 7–10 days under suitable ground conditions. This allows the drilling equipment to be installed with less preparatory work and helps projects move into the drilling stage sooner.

Working Principle of a Raise Boring Machine
A Raise Boring Machine creates vertical or inclined openings between two underground mine levels through a pilot-hole-and-reaming process. The machine is positioned at the upper level and first drills a smaller-diameter pilot hole downward until it reaches the lower level. After breakthrough, a reaming head is connected to the drill string from below. The machine then rotates the drill string and pulls the reaming head upward, cutting the surrounding rock until the opening reaches the required diameter. This method produces a continuous raise without requiring conventional drill-and-blast excavation along its full length.
1. Pilot Hole Drilling
The drilling unit is installed and accurately aligned at the upper working level. A pilot bit attached to the drill string starts drilling downward through the rock. As drilling progresses, additional drill rods are connected to extend the drill string toward the lower level.
The pilot hole establishes the direction and alignment of the final raise. Its diameter is smaller than the planned finished opening, allowing the drill string to pass through before the reaming operation begins. Maintaining the planned drilling direction is important, particularly for deep or inclined raises.
2. Pilot Hole Breakthrough and Reamer Installation
Once the pilot hole reaches the lower working level, the pilot bit is removed from the drill string. A reaming head is then connected to the lower end of the drill string.
The reaming head carries cutting tools arranged around its working surface. Its diameter corresponds to the required finished raise diameter. Before reaming begins, the lower working area must provide enough clearance for connecting the reamer and handling the drilling tools.
3. Upward Reaming
After the reaming head is installed, the machine rotates the drill string while applying controlled pullback force. The reaming head cuts into the surrounding rock as it moves upward along the pilot hole, gradually enlarging the opening.
During this stage, rotary torque, pullback force and cutter arrangement determine how the machine handles the rock-cutting load. The required operating capacity varies with rock strength, raise diameter and cutting conditions.
4. Rock Removal
As the reaming head breaks the surrounding rock, the fragmented material falls through the enlarged opening to the lower working level under gravity. Underground loaders or other mucking equipment collect and transport the broken rock away from the drilling area.
The lower-level working area must have sufficient space for rock accumulation, collection and removal. Proper coordination of mucking operations helps keep the reaming area clear throughout the drilling process.

Main Components of Raise Boring Equipment
A complete Raise Boring Equipment system combines mechanical, hydraulic, electrical and drilling-tool assemblies. Each component has a specific role during pilot drilling and upward reaming.
| Component | Main Function |
|---|---|
| Main Drilling Unit | Supports the drilling structure and provides rotary and axial forces |
| Rotary Drive System | Transmits rotation and torque to the drill string |
| Hydraulic Thrust and Pullback System | Controls drill-string advancement and reamer lifting |
| Drill Rods and Connections | Transfer torque and axial loads between the machine and cutting tools |
| Pilot Bit | Drills the initial pilot hole between underground levels |
| Reaming Head | Enlarges the pilot hole to the required raise diameter |
| Hydraulic Power Station | Supplies hydraulic power to the machine’s operating systems |
| Electrical and Control System | Controls motor operation and relevant machine functions |
| Transportation Chassis | Supports underground transportation and equipment positioning |
The drill rods, pilot bit and reaming head must be compatible with the machine’s connection dimensions and operating loads. Their selection also depends on the planned drilling depth, hole diameter and geological conditions.


Key Performance Features of Raise Boring Machines
High Thrust and Pullback Capacity
Thrust force drives the pilot bit into the rock during initial drilling, while pullback force lifts the reaming head during upward reaming. These two forces determine the machine’s ability to handle axial loads throughout the drilling cycle.
Available configurations provide 620–2,400 kN thrust force and 1,320–4,100 kN pullback force. Higher-capacity configurations are designed for heavier drilling loads and larger reaming diameters. The required capacity also depends on drilling depth and rock-cutting resistance.
Rotary Torque
The rotary drive transmits torque through the drill string to the pilot bit and reaming head. Sufficient torque is essential for maintaining cutting performance when drilling through hard rock or enlarging large-diameter openings.
The available configurations provide 50–168 kN·m rated torque, with peak torque reaching 197 kN·m on the largest rail-mounted configuration. Rated torque and peak torque represent different operating values and should be evaluated separately.
Multiple Installation and Transportation Arrangements
Raise boring machines are available in rail-mounted, tire-mounted and foundation-free configurations, each suited to different underground mine layouts.
- Rail-mounted: Uses underground track systems for equipment transportation and positioning.
- Tire-mounted: Moves along suitable trackless mine roadways without requiring rail infrastructure.
- Foundation-free: Uses a hydraulic support-column system to secure the machine without a conventional concrete foundation, reducing foundation construction work.
The choice of configuration affects equipment transportation, installation space and site preparation requirements.
Inclined Raise Drilling
Raise boring machines can be configured for both vertical and inclined openings. The drilling angle determines the required machine positioning, drill-string alignment and tooling arrangement.
The foundation-free configuration supports drilling angles from 15° to 90°. Rail-mounted and tire-mounted machines have their own specified angle ranges, depending on configuration.
Applications of Raise Boring Machines
Raise boring machines are used to create vertical and inclined openings between underground mine levels. These openings support ventilation, ore handling, backfilling, personnel access and underground infrastructure. Their diameter, depth and inclination are determined by the mine layout and the intended function of each raise.
Mine Ventilation Raises
Ventilation raises connect underground levels and provide dedicated passages for fresh-air intake and return-air flow. They form an important part of the mine ventilation network, allowing air to circulate between production areas, access tunnels and exhaust routes.
The required raise diameter is determined by ventilation volume, air velocity and system pressure losses. The opening must also connect correctly with the planned ventilation routes to avoid unnecessary airflow restrictions.
Ore Passes
Ore passes transfer broken ore from upper production levels to lower loading and haulage levels through gravity flow. They reduce the need for additional underground transport equipment between mining and loading areas.
The raise diameter must accommodate the expected ore volume and fragment size. Oversized rock, irregular fragmentation and material buildup can cause blockages, so the discharge arrangement, wear protection and access for blockage removal should be considered during design.
Waste Rock and Backfill Passes
Waste rock and backfill passes provide vertical routes for moving excavated waste material or backfill between underground levels. Waste rock can be transferred to designated storage or disposal areas, while backfill material can be delivered to mined-out stopes for ground support and space filling.
Their dimensions and discharge arrangements must suit the material’s flow characteristics, required transfer volume and the mine’s material-handling equipment.
Service and Utility Raises
Service raises provide dedicated routes for installing and routing underground infrastructure, including:
- Water supply and drainage pipelines
- Compressed-air lines
- Electrical power cables
- Communication cables and other utility services
The finished opening must provide sufficient clearance for the installed services, pipe supports and cable arrangements. Allowance for future maintenance and additional utility lines should also be considered.
Manways and Escape Raises
Manways provide designated routes for personnel movement between underground levels, while escape raises can form part of a mine’s emergency egress system.
These openings may require ladders, platforms, separate compartments and additional ground support. Their final dimensions and internal arrangements must comply with the mine’s personnel-access and emergency-escape requirements.visions for ground support, ladders, platforms, compartmentation and mine safety systems must be incorporated into the project design.
How to Select the Right Raise Boring Machine
Selecting a Raise Boring Machine starts with the required raise dimensions and underground working conditions. The finished diameter, drilling depth, inclination and rock characteristics determine the machine capacity and tooling required. Underground access, transportation arrangements and available power supply also affect which configuration can be installed and operated at the site.
| Selection Factor | Information to Confirm |
|---|---|
| Raise Diameter | Required finished opening diameter and reaming-head size |
| Drilling Depth | Distance between upper and lower working levels |
| Drilling Angle | Vertical or inclined drilling requirements |
| Rock Conditions | Rock strength, abrasivity, jointing, fractures and groundwater |
| Underground Access | Roadway dimensions, transport route and installation space |
| Installation and Mobility | Rail-mounted, tire-mounted or foundation-free configuration |
| Power Supply | Available voltage and electrical infrastructure |
| Lower-Level Access | Space for reamer installation and broken-rock removal |
| Drilling Tools | Pilot bits, drill rods, stabilizers and reaming-head configuration |
For deep raise drilling, particular attention should be given to drill-string tensile strength, connection capacity and borehole alignment. These factors become increasingly important as drill-string length and operating loads increase.
Reaming Diameter and Drilling Depth Range
Different raise boring machine configurations cover different combinations of reaming diameter and drilling depth. The chart below illustrates the available capacity ranges, from smaller-diameter raises to large underground openings.
The illustrated configurations cover reaming diameters of approximately 1.5–8 m and drilling depths of up to approximately 1,000 m. These figures represent different machine configurations; the maximum diameter and maximum drilling depth should not be assumed to be achievable simultaneously.
For a specific project, the selected machine must have sufficient capacity for the required raise dimensions, rock conditions and drilling loads.

Raise Boring Machine Installation and Operating Considerations
Successful raise boring depends not only on machine capacity but also on how well the equipment and underground working areas are prepared before drilling.
Equipment Alignment
The machine is positioned over the planned raise centerline before pilot drilling begins. Accurate alignment at this stage helps keep the pilot hole on its intended path. Any deviation can become more difficult to correct as drilling depth increases.
Ground Support and Stability
The machine generates substantial thrust and pullback forces during operation, so the installation area needs a stable supporting surface. For foundation-free configurations, hydraulic support columns replace the conventional concrete base, but the surrounding ground must still provide sufficient bearing capacity to keep the machine securely positioned.
Drill String and Tool Compatibility
Drill rods, threaded connections, pilot bits and reaming heads all work as part of the same drilling system. Their dimensions and load ratings need to match the machine configuration and planned raise dimensions. This becomes particularly important in deep-hole operations, where drill-string weight and tensile loading place greater demands on the rods and connections.
Lower-Level Working Area
The lower working level is where the pilot bit is removed and the reaming head is installed. Adequate clearance is needed for these operations, along with space for collecting and transporting broken rock during upward reaming. Planning the mucking arrangement in advance helps prevent rock accumulation from interfering with underground work.
Personnel Safety and Work-Zone Control
Personnel safety is critical throughout raise boring operations. The upper and lower working areas must have clearly defined restricted zones, with unauthorized access prevented during drilling and reaming.
Particular attention should be given to falling rock, rotating equipment, suspended drill-string components and hydraulic systems. Personnel must remain clear of the area beneath the active reaming operation. Before maintenance, tool changes or handling drill-string components, the machine must be safely stopped and relevant power and hydraulic energy isolated.
Reliable communication between upper and lower working levels, adequate ground support, proper ventilation and clearly established emergency evacuation routes are also essential for protecting underground personnel.
Why Choose OctaMach
Underground drilling projects rarely share identical access conditions, raise dimensions or installation requirements. A suitable equipment configuration needs to account for these differences rather than relying on a single maximum-capacity figure.
OctaMach offers different Raise Boring Machine arrangements, including rail-mounted, tire-mounted and foundation-free configurations. This allows equipment discussions to cover different underground transportation systems, installation spaces and drilling-angle requirements.We focus on the technical details that determine whether a machine suits the intended project, including raise diameter, drilling depth, rock conditions, roadway dimensions, power supply and drilling-tool configuration.
For projects involving restricted underground access, inclined raises or foundation-free installation, the equipment configuration and auxiliary requirements can be reviewed according to the actual site conditions.Our aim is to provide clear equipment information and practical configuration options so that each project can evaluate the machine against its real drilling requirements.
FAQ
Q1:Can a Raise Boring Machine Operate Without Access to Both Underground Levels?
A1:Conventional raise boring requires access to both the upper and lower working levels, as the reaming head must be installed at the lower level before upward reaming. If only one level is accessible, a specialized blind raise boring system may be required, with different drilling tools and drill-string support arrangements.
Q2:Is a Raise Boring Machine Suitable for Hard, Abrasive or Fractured Rock?
A2:Yes, but machine and cutter selection must account for the actual rock conditions. High rock abrasivity increases cutter wear, while heavily fractured or jointed formations can cause overbreak, borehole instability and reaming interruptions. Geological investigation and rock testing are important before finalizing the equipment configuration.
Q3:What Factors Affect the Operating Cost of a Raise Boring Machine?
A3:Main cost factors include cutter consumption, drilling productivity, maintenance, power consumption and downtime. Rock conditions, reaming diameter and operating parameters also affect cutter wear and overall efficiency.
Q4:What Should Buyers Check Before Accepting a Raise Boring Machine?
A4:Check thrust and pullback performance, rotary drive, hydraulic and electrical systems, and drill-string condition against the agreed specifications. Also confirm commissioning, operator training, warranty and spare-parts support.